Navigate PM Surya Ghar with the right checks before installation.
Your Energy helps residential customers understand the rooftop solar process, prepare project information, evaluate system options, and coordinate installation while current eligibility and subsidy rules remain subject to official approval.
A practical PM Surya Ghar application journey.
Start with the official portal and current utility process. Keep applicant, electricity connection, installation records, inspection requirements, and bank information consistent from registration through disbursement.
Confirm current eligibility
Check the residential connection, applicant details, property situation, system limits, and current programme conditions.
Follow the official workflow
Complete portal registration and the applicable DISCOM steps before proceeding at each required stage.
Preserve records
Keep application references, approvals, equipment details, invoices, photos, inspection records, and bank information organized.
Documents and decisions to prepare.
The exact list depends on current portal and DISCOM requirements, but these categories commonly need attention.
Applicant and connection
Keep the electricity consumer number, applicant identity, mobile number, property details, and portal information consistent.
Technical selection
Confirm system size, approved equipment requirements, roof suitability, connection limits, and utility process.
Installation evidence
Retain invoice, serial numbers, photographs, test records, net-metering or inspection documents, and commissioning information.
Bank and follow-up
Use accurate beneficiary bank details and monitor the official application status until a final decision is recorded.
Move from initial information to a site-specific decision.
Indicative guidance is useful for orientation. Final sizing, pricing, generation, eligibility, installation, and timeline require the relevant project checks and current rules.
Requirement review
We review the property type, electricity bill, connection, priorities, and expected timeline.
Site and load assessment
The team checks usable roof, shade, structure, access, electrical layout, and the loads solar should offset.
System proposal
The proposal documents capacity, equipment, expected generation assumptions, scope, exclusions, and commercial terms.
Execution planning
After approval, responsibilities for permissions, material, installation, testing, handover, and support are coordinated.
Clear answers before the next step.
These answers are general guidance. The final project must follow its actual site conditions, equipment, utility requirements, and current government rules.
Who is eligible for PM Surya Ghar?
Eligibility depends on current programme rules, the residential electricity connection, applicant and property conditions, system and equipment requirements, and successful completion of the official process.
How much subsidy will I receive?
Do not rely on an old fixed figure. The applicable amount and capacity treatment must be checked on the official PM Surya Ghar portal for the current date and project.
Can a commercial property claim the residential benefit?
Commercial projects should not assume eligibility for residential central financial assistance. Check the current programme category and obtain project-specific advice.
Can Your Energy guarantee subsidy approval?
No private installer can responsibly guarantee government approval or disbursement. Your Energy can support project preparation and coordination, while the competent authorities make the final decision.
Discuss PM Surya Ghar with Your Energy.
Share your property type, recent electricity bill, city, roof context, and phone number. We will begin with an indicative assessment and identify the next appropriate check.
